#5. FAILURE TO TEST ALL POSSIBLE FAULT AND ALARM RECOVERY SCENARIOS

There is an increase in the number of possible fault conditions for modern SCRs using digital processors or digital communications.   We recommend methodical and systematic testing to test all possible alarms and fault conditions before a system is placed in production to reduce startup costs and scrapped product.

#6. FORGETTING TO FUSE ALL LEGS FEEDING THE SCR AND LOAD

A short to ground can lead to a runaway load in single phase or three phase applications possibly damaging expensive loads.